Sectors
Power
Sub Sectors
Transmission & Distribution
Services
Design & Engineering
Location
Oman
This project involved power system studies to integrate an 85 MW load at a 220 kV grid substation. The assignment focused on ensuring stable grid integration and reliable operation by evaluating system behaviour under expected operating conditions.
The study scope included load flow analysis, dynamic simulation and power quality assessments to evaluate steady state performance, dynamic response and quality of supply parameters for the connected load. The deliverables included approved study reports supporting implementation readiness.
TCE's Scope
TCE carried out system modelling and studies including load flow, dynamic simulation and power quality assessment for the 85 MW load connection at 220 kV. The scope included preparation and submission of steady state analysis reports, dynamic analysis reports and power quality reports.
Impact
The studies enabled reliable integration of an 85 MW load by validating grid performance and operational suitability at the 220 kV interface. Approved reports reduced uncertainty related to steady state performance, dynamic response and power quality compliance.
About Us
Overview Our Leadership MilestonesSubsidiaries
- Ecofirst - Tata Consulting Engineers USA, LLC Corporate Social Responsibility Corporate GovernanceMedia
Media Kit Notices Annual Reports Marketing Collateral Videos TCExpressions Press Releases Press Coverage© Tata Consulting Engineers Limited. All Rights Reserved | Site Credits:DV